Sept 27, 2026 Progress Notes
A mid-stage log of the capsule-robot project and its magnetic detection work.
1. Capsule Robot Progress
1. Power Section
Two small-package parts selected: LP5907SNX-3.3/NOPB and SSP7615-30DFR.
2. Bluetooth Section
Selected the DA14531-01000FX2; the working environment is set up and basic functionality has been verified.
3. Main Chip and Software
Not yet verified. LCMXO2-1200HC-4SG32C
Todo
- Basic FPGA verification
- Bluetooth data-transfer verification
- Flash and SRAM verification
Todo
- Oscillator start-up verification
- Combined end-to-end verification
- Software