NW' Blog
September 17, 2026 · Content Page

Sept 27, 2026 Progress Notes

A mid-stage log of the capsule-robot project and its magnetic detection work.

1. Capsule Robot Progress

1. Power Section

Two small-package parts selected: LP5907SNX-3.3/NOPB and SSP7615-30DFR.

Small-package power chips Small-package power chips

2. Bluetooth Section

Selected the DA14531-01000FX2; the working environment is set up and basic functionality has been verified.

Bluetooth section

3. Main Chip and Software

Not yet verified. LCMXO2-1200HC-4SG32C

Placeholder

Todo

  1. Basic FPGA verification
  2. Bluetooth data-transfer verification
  3. Flash and SRAM verification

2. Magnetic Detection

To be verified — see the article 20MHz Clapp Oscillator.

Placeholder Placeholder

Todo

  1. Oscillator start-up verification
  2. Combined end-to-end verification
  3. Software
Comments Leave your thoughts
Guide